MechMate CNC Router Forum

MechMate CNC Router Forum (http://www.mechmate.com/forums/index.php)
-   MechMates already cutting (http://www.mechmate.com/forums/forumdisplay.php?f=78)
-   -   Boxes, Clamps and Thien Dust Collector! #83 - Brighton ON CA (http://www.mechmate.com/forums/showthread.php?t=2608)

camilleg Mon 14 February 2011 12:50

Brilliant clampology for the traveling drill press!

"Drew blood" -- did the dry-eraser still work, or was bleach needed?

melissa Mon 14 February 2011 15:22

Hmph, I knew it was going too smoothly.

I just finished drilling the holes in the X rails to 1/2".

Next step is drilling the proxy target holes. As luck would have it, with my bolt spacing, they'll intersect the second-last bolt at each end :(. They need to be symmetrical to work properly at both ends... so what to do???

Move the second-last bolt an inch or two out of the way, and re-drill the rails and beams to match? Any suggestions?

camilleg Mon 14 February 2011 15:29

Move the second-last bolt an inch or two out of the way, and re-drill the rails and beams to match, as you say.
It might feel like backtracking, but anything more elaborate risks even greater backtracking if that goes awry.

camilleg Tue 15 March 2011 16:59

For anyone who's curious, so much progress has been made in the past month that Melissa hasn't had time to post anything about it. As of a few minutes ago, I believe the table is entirely degreased, washed, and now drying before paint goes on (tricky, in that unheated aircraft hangar in what still is winter in the Great White North).

melissa Thu 17 March 2011 01:41

3 Attachment(s)
Here's what I came up with for the hole interference on the X rails. I had some 1/2" steel rod on hand, so I cut off four pieces, pressed them in with the hydraulic press, tack welded the back side, and then ground the top face flush. After painting, you won't see them anymore :).

Also a photo of the stop blocks welded in place on the X rails.

melissa Thu 17 March 2011 01:49

4 Attachment(s)
The cross bearers were cut from surplus steel, formerly used for pallet racking. I tried cutting the angle on my 14" dry-cut saw, but it didn't work very well. The alternative was my steelmax saw, but I didn't want to set up the angle 15 times. Instead, I clamped five channels together, and did one long cut.

With them cut to length, I opted to mark and punch the holes for the spoilboard bolts, rather than using a jig. I clamped them in sets of 8, and marked both sides before unclamping (I drilled holes top and bottom, so I can drill through the channel straight into the spoilboard).

melissa Thu 17 March 2011 01:56

2 Attachment(s)
Something that had to be done before installing the cross bearers: installing hanger bolts in the ceiling for the dust collection hose! With an 11-foot ceiling, ladders are scary at best.

I moved my scaffold into the open space of the mechmate, to be able to drill the holes and install the bolts. The scaffold is 2.5' wide x 6' long, and was able to spin around inside half of the table :D.

The second photo is part of the fastener collection for the mechmate. The other side of my storage unit is various bulk screws and bolts, but this side is all carefully selected for the mechmate.

melissa Thu 17 March 2011 02:03

5 Attachment(s)
How to paint in Canada during winter: build a tent inside the workshop :rolleyes:. The inside volume of the tent is about 1700 cubic feet, as compared to the workshop's volume of 17000 cubic feet! Much easier to keep warm.

The main support of the tent is the gantry crane, with various bits of 2x4 lumber clamped and bolted together.

The last photo shows before and after degreasing the main beams. If the water is beading like that, then the paint will certainly bead too :mad:.

melissa Thu 17 March 2011 02:07

Table and Y-car primed!
 
1 Attachment(s)
Finally, on to paint! It took 8 hours today to prime the Y-car and main table (sans cross-bearers). It's a surprising amount of area to cover.

Next is painting the cross bearers and X-rails, and then the cross bearers get welded in place. Progress!

camilleg Thu 17 March 2011 10:45

1, Woohoo! That's a milesto-, um, kilometerstone.
2, That tent is rather more elaborate than anything we ever made from sofa cushions and bedsheets.

melissa Tue 22 March 2011 13:42

4 Attachment(s)
More painting progress: cross bearers and rails primed and painted.

The ends of the cross bearers are unpainted, as they still need to be welded to the base table.

domino11 Tue 22 March 2011 13:48

Melissa, your progress is looking great! :)

Johannescnc Tue 22 March 2011 14:32

Admirable work and progress.
Question, over your plastic bolt bin... " keine gefingerpoken!" Looks some what familiar :rolleyes:

melissa Tue 22 March 2011 15:14

I was waiting for someone to comment on the labels :). It's a reference to to the "blinkenlights" poster:

http://original.jamesthornton.com/fu...kenlights.html

ACHTUNG! Alles touristen und non-technischen peepers!

Das machine control is nicht fur gerfinger-poken und
mittengrabben. Oderwise is easy schnappen der springenwerk,
blowen fuse, und poppencorken mit spitzensparken.
Der machine is diggen by experten only. Is nicht fur
geverken by das dummkopfen. Das rubbernecken sightseenen
keepen das cotten picken hands in das pockets,
so relaxen und watchen das blinkenlights.

Come to think of it... I may engrave that and mount it above the mechmate! :D

Johannescnc Tue 22 March 2011 16:17

Hey! cool... My wife and I looked at the link and both of us feel it is a mix of Plattdeutsch, English, Dutch and Deutsch! :eek:
She is looking at the site now and seems to be very entertained :p
Thanks for sharing that...

melissa Thu 24 March 2011 14:54

3 Attachment(s)
More blue paint... gantry and table.

camilleg Thu 24 March 2011 18:12

No doubt the question's been asked before... so how long can a MM hold its breath?

Lookin' better and better!

melissa Fri 25 March 2011 22:06

2 Attachment(s)
Now we're really looking like a MechMate :). Cross bearers clamped in place in preparation for welding.

I used a tensioned fishing line to align the pre-drilled holes in the cross bearers.

HomeMadeCnc Fri 25 March 2011 22:41

Looks great! I wish I had the size shop that you have. What kind of heat are you running in the shop besides the construction heater?

Tim

domino11 Fri 25 March 2011 22:47

That table keeps looking longer and longer. Great work Melissa!

Gerald D Fri 25 March 2011 23:01

Hey, that's ShopBot's colour! :D

melissa Sat 26 March 2011 05:13

Quote:
Originally Posted by Gerald D View Post
Hey, that's ShopBot's colour! :D
Oops! :o

Tremclad paint didn't have a lot of choices in blue :rolleyes:.

Gerald D Sat 26 March 2011 05:15

Hey, just pulling your leg - don't change it now! :)

camilleg Sun 27 March 2011 11:55

@Tim: Friction from the drill press when we're low on cutting oil.
@Gerald: Maybe we've discovered shopbot's corporate secret?

melissa Mon 28 March 2011 23:25

3 Attachment(s)
The cross bearers are now welded in, and the ends primed:

Attachment 11435

Also started on painting the control box, even though I haven't drilled the cable and pushbutton holes yet.

Attachment 11436Attachment 11437

melissa Mon 28 March 2011 23:28

About shop heating: I'm investigating propane radiant heaters, as well as solar air heating. My shop is about 18,000 cubic feet, so solar is looking really attractive!

danilom Tue 29 March 2011 04:16

This can be pretty easy to build, I myself just collected 240 cans for this and getting ready to assemble the unit.
http://www.cansolair.com/

Is this what are you using Michael?

melissa Tue 29 March 2011 10:28

Danilo,

I haven't actually installed a solar unit yet, but that's one of the models I was looking at. Right now, I'm trying to get the MechMate operational as quickly as possible :).

Melissa

melissa Tue 29 March 2011 22:33

Table painting complete!
 
I finished painting the table tonight: the ends of the cross bearers, and the outside of the main beams.

I'll post photos once I open up the tent again, so I can take a photo from more than 2 feet away :).

Next up is the spoilboard. I'm glad I own a full-size cargo van, as I need nine sheets of 3/4" MDF, total weight over 800 lbs. Installed, the spoilboard will weigh somewhere around 650 lbs.

domino11 Wed 30 March 2011 13:47

Melissa,
Are you using 4x8 or larger sheets


All times are GMT -6. The time now is 21:45.

Powered by vBulletin® Version 3.8.3
Copyright ©2000 - 2026, Jelsoft Enterprises Ltd.