fabrica Sat 13 January 2007 10:46

Gerald, If everything proceeds well as expected I hope to have the "Mechmate" up and running during the next couple of days.

Where should I start from. I a new to CNC stuff. How am I to comission the machine ? What are the first steps that I should take? I am totally dependent on this forum to provide me with the guidence (criticism, advice) to make this whole project a succesfull and a enjoyable venture.

Other than Gerald their are so many other guys who could help guys like us. Please your presence felt. Once I get over the initial hickups and gain experiance on this CNC machining subject I would be more than willing to help other guys to overcome problems during the process of developing this wonderful machine.

Gerald_D Sat 13 January 2007 11:43

Fabrica, yes, we need a set of "commissioning instructions". But, some suggestions for now....

1. Test your motor movement while the pinions are not engaged to the racks. Unhook the springs and swing the motors down away from the racks. Run simple programs in Mach3 and use the cursor keys to move the motors. Check if all the motor directions are correct. Check if your Emergency stop works.

2. If you have connected the proxy switches as limit switches, move the gantry & car to the limits by hand and see if they stop the freely turning motors.

3. When you do get brave enough to engage a pinion into a rack, start with only the y-car. And start with that car in the middle of the gantry.

4. Then engage the x-axis motors. Realise that one motor will be turning clockwise while the other turns anti-clockwise.

5. Finally the z-axis.

7. Follow the Mach instructions and videos to set the motor speeds and accels.

8. Then commission the router and cut the table top flat.

9. After flatting the table, then set the axes pependicular to each other.

Through this whole process, check Gecko's, motors and toroid for overheating. Check often - they work the hardest when the motors are just standing still! Don't disconnect motor cables unless the red light on the Gecko is off.

This should give you some idea.....

fabrica Sat 13 January 2007 21:04

OK thanks. Very restless until I see the beast moving around.

Bill McGuire Sat 13 January 2007 22:52

Congratulations Fabrica....
I'm envious. You have already helped me alot through your discussions and pictures!

fabrica Sat 13 January 2007 23:36

Bill, how much of progress have you made on your machine.

fabrica Mon 15 January 2007 07:49

Below given are some some pictures showing the progress of my project.

Below given is a photo of one motor mounted on gantry with springs loaded. You would also observe in the background the racks mounted on the underside of the X rail.

http://www.mechmate.com/Forum/messages/329/3233.jpg

The underside of the X rail showing the racks and pinions completed.

http://www.mechmate.com/Forum/messages/329/3234.jpg

Motors mounted on the gantry

http://www.mechmate.com/Forum/messages/329/3235.jpg

Bushes mounted on underside of the router to facilitate the mounting on to the Router bracket.

http://www.mechmate.com/Forum/messages/329/3236.jpg


The underside of the router shown with bracket.

http://www.mechmate.com/Forum/messages/329/3237.jpg

The side view of the bracket with router.

http://www.mechmate.com/Forum/messages/329/3238.jpg

stoppers assy and mounts for proxies assembled on the Gantry.

http://www.mechmate.com/Forum/messages/329/3239.jpg

Z azis partially assembled.

http://www.mechmate.com/Forum/messages/329/3240.jpg

Gerald_D Mon 15 January 2007 09:38

Fabrica, I am very, very impressed! Tonight I will have a glass of wine in your, and your engineer's honour!

After some digestion and celebration I will give you some detailed comments, but for now we just enjoy.... http://www.mechmate.com/Forum/clipart/happy.gif

fabrica Mon 15 January 2007 09:53

Thanks Gerald, for you encouraging comments. How could I enjoy with without seeing the beast (Mechmate)running around. I will not have a peacefull sleep until I see the machine in full flow. Believe me, during the past one week we all in our workshop has put in more than 10 hrs of work everyday to come upto this level.

Gerald_D Mon 15 January 2007 10:10

That beast is still a baby under its mother's care - be gentle with it. Don't force it to walk too soon.....http://www.mechmate.com/Forum/clipart/happy.gif

Hugo Carradini Mon 15 January 2007 20:17

What a nice job. Congratulations . It is really and inspiration for all off us that dream with a beauty like that. Please don't forget to show us your first cut.
Regards
Hugo Carradini

fabrica Mon 15 January 2007 21:27

Thanks for your compliments Hugo. I will definitly post the pictures of the cuts no sooner I start working.

Gerald_D Mon 15 January 2007 22:07

The router must sometimes work in "deep" areas and you want maximum space around the collet. Suggest you minimise distance C (to zero) and use countersunk head screws at B. Most important is to use the longest screws possible to use all the thread in the plastic at A.

http://www.mechmate.com/Forum/messages/329/3252.jpg

fabrica Tue 16 January 2007 00:31

My project completed! - Fabrica (Sri Lanka) - Serial No. 1
 
Ok, I will do the required modification.

Gerald_D Tue 16 January 2007 01:39

http://www.mechmate.com/Forum/messages/329/3254.jpg

Screw head A (8mm) is supposed to be a countersunk because there is a risk that it can touch the angle iron rail. Head B (10mm) is above the rail.

There is a secial trick to hold screw A while adjusting the nut for tension. The tip of the screw (other side, away from head) is slotted with a hacksaw and then a screwdriver can hold the screw from the "outside".

If you have enough space for the screw heads, then don't change anything.

fabrica Thu 18 January 2007 05:30

The wiring is done and for the last three hours we have been playing around with the mach3 software get the settings correct.

Maybe we still have not got the pins and other things configured properly. When we try to jog with the sofware the motors do not move. No voltage is developed at the outputs of the steppers drivers.

Gerald_D Thu 18 January 2007 05:41

I think it took me 3 days.......
I started on the kitchen table with one motor and one gecko - after that I built the gantries and cars.

A big problem for me was to understand what the E-stop does and how to "reset" the Mach main screen. Nothing will move while the reset button on the bottom left of the screen is flashing red - it must be only green.

Gerald_D Thu 18 January 2007 05:51

To see if Mach is working, you do not need the Gecko's and the steppers. You can just look at the PMDX board. There are LED's that will flash where the gecko wires are connected, when the step/direction pulses are received correctly.

The PMDX looks like a discotech when everything is working right.

fabrica Thu 18 January 2007 10:09

Ok Gerald maybe I made a mistake by during the process of posting.

This is what i wanted to inform you in the earlier post.

" Gerald Finally I got the motors to move (of course with racks detached from the pinions). What i did to overcome the situ was to switch the jumper settings on JP2. From the original pin connections of 2 to 3 I changed to 1 to 2. This made the PMDX card LED's to light up and the motors to move.

By doing this I have disabled the E-stops, Fault and charge pump circuits. After doing this change I never expected the E-stop to work. But it still did work. What could be the reason for this?

Another reason why I did this change was because I suspected (after reading your earlier mail) that the e-stop settings are a tricky issue. Once I sort out the other matters I could get back to this problem later. The charge pump was also enabled through mach 3 settings.

After changing jumper settings all 4 motors started to turn, other that one motor fixed to X axis (A axis, slave of X).

At the driver point I changed the wire connections (switched the wires connected to non working driver to to the driver which was working) and the non working motor started to work. We could suspect two things. Either the stepper driver is playing up or the Output circuit of the PMDX card which connects the faulty driver board is not working. At this point we called it a day and wound up operatins since it was 8.00 pm in the night.

One more thing which I observed in the suspected stepper driver unit was the the LED in that was glowing much more brightly than the other drivers which were working normally.

Gerald Can a stepper drive be repaired if it is faulty?. Anyway I have one spare driver board in stock.

Brian_B Thu 18 January 2007 10:13

fabrica,

The Gecko website has a nice "Stepper Motor Basics" page that will walk you through the theory and hookup. Go to: http://www.geckodrive.com/photos/Step_motor_basics.pdf

There are many similar pages available online as well. Another is:

http://www.rmsmotion.com/resources/step_basics_v1_0.pdf

Brian

fabrica Thu 18 January 2007 10:28

Brian, Thanks for your input. But how does the info provided by these links relate the issues that I have raised in my earleir mail.

The first issue which I raised was when I disabled the E-Stop (through jumper settings) to get the motors to turn how come the E-stop is still working.

The second issue was the problems that I am encountering with the Gecko drivers (only suspected not yet convicted).

Gerald_D Thu 18 January 2007 10:52

WELL DONE! You achieved in one day what took me about 3 days http://www.mechmate.com/Forum/clipart/happy.gif

In Config > Ports & Pins > Input Signals scroll down to the line EStop and look in the column "Active Low" change from green to red, or vice versa to get the e-stop to work correctly.

The driver LED's are not equally bright - I don't think that this indicates a fault. (Gecko will replace a faulty driver for free, but you have to arrange the transport). I am guessing you have a Mach ports&pins error, so I suggest you swap motors at the PMDX to see what happens.

fabrica Thu 18 January 2007 11:08

Ok I will swap motors at the PMDX point to see where things have gone wrong and post you the results by tomorrow morning before you start work (we are 2.5 hrs ahead of you). Now it's almost 11.30 pm over here. It's time for me to hit the deck after very strenuous and ejoyable day's of work.

fabrica Thu 18 January 2007 21:30

Checked the motors. It was was the driver which was faulty. Replaced the driver with new driver motor worked perfectly.From CNCZOne found a simiple way to check Gecko's. Info given below.

"Quick test. Disconnect the main connector, get a multimeter and set it to Ohms. Connect a probe to COMMON, then measure COMMON to STEP, then COMMON to DIRECTION. The reading you want to see is 1.2K give or take 5%. Get that and the drive is probably OK".

I followed the procedure and did the checking. Both readings were perfect. For the monet I will go ahead with the new Gecko and see what could be done with older unit later.

fabrica Thu 18 January 2007 21:33

I have encountered two more problems today morning while setting up the machine.

One motor on the x drive is getting too heated. The other issue is that the Z axis motor is rotating only in one direction.

Gerald_D Thu 18 January 2007 21:48

Hot motor: Check your resistor that you fitted to the Gecko. Do not trust your ability to read the colours on the resistor, use an ohm-meter to measure it. Measure all the resistors - if this one is different then that is the cause. If it is the same, then there is a setting under the cover of the gecko which must be checked.

Direction: On the PMDX there is a LED for each motor which shows the direction. Is this LED indicating the direction change correctly? (compare to the behaviour on the other motors) If it is, then check the wire connections between the PMDX and the gecko.

Strange gecko behaviour: nearly a year ago gecko had problems with bad connectors. They changed the supplier. Maybe you have one of these. The connector does not like to be removed many times from the gecko.

fabrica Thu 18 January 2007 22:45

The problem with motor heating was sorted. After changing the drivers we had not inserted the resistor on to the new driver.

The problem with the Z axis motor still exists. It is only moving in one direction. When we try to move it in the other direction it only makes a noise but the shaft does not turn.

One more thing that I observed was that when pressing the e-stop button, the LED on the PMDX card which is situated just above the output connectors lights up. This is very unusual.

fabrica Thu 18 January 2007 22:49

With regards to the lights on PMDX. For X,Y and A outputs the light tuns on when moving in one direction and does not light up when moving in the other direction. On the Z outputs the light turns on in one direction but is very faint.

Gerald_D Thu 18 January 2007 22:55

Is the Z-motor still disconnected from the rack? What happens if you swap that motor's wires to another gecko?

Your e-stop logic, with PMDX jumpers and Mach ports and pins settings is still mixed up. I have little experience to fix this because ours worked right and then I left it alone for more than a year. The only thing I can suggest is to put the jumpers as per the drawing above, put a temporary wire across the e-stop contacts (like the pmdx was supplied - J6 across e-stop and GND), and then play with the Mach settings until it works correctly. When you put the motors against the racks, then you can put the E-stop switch in that jumper wire at J6.

Gerald_D Thu 18 January 2007 22:59

Regarding the faint LED for the Z: Disconnect the wire below the LED (the one going to the Gecko) and see if it is still faint - maybe there is a short in that wire....

fabrica Thu 18 January 2007 23:35

The Z axis problem was sorted out, it had been a software issue (mach3).

I am starting to enjoy this Gerald.

Gerald_D Thu 18 January 2007 23:48

Can I relax now? http://www.mechmate.com/Forum/clipart/happy.gif

Would you agree now that it would be good to have the 4 motors on the kitchen table at home first? Do this in parallel to the steel construction....

Now you can tell us your secret? I am sure you have already connected the motors to the racks and made the beast move....http://www.mechmate.com/Forum/clipart/proud.gif

fabrica Fri 19 January 2007 01:04

The machine is moving well without any problems. Setting up the home point (0,0) and the limits.

Please educate me on the the rate of accelaration that a normal mechmate should run at. We increased acceleration once and the gantry jumped off the rails. May be we should increase the tension of the springs further. We have kept it at the lowest point.

fabrica Fri 19 January 2007 01:08

Hope I am not troubling you too much. Fully agreed on the kitchen table project.

Regarding your relaxation matter, no way. You have taught the wrong thing to a wrong guy.

Gerald_D Fri 19 January 2007 01:39

Our MechMate has direct drive motors, so the settings may not apply to you....Our settings X & Y axes are 500 mm/sec/sec and Z axis is 1500 mm/sec/sec. Our machine is set rather slow and lazy. If we drop the acceleration down much more then we get round corners for square parts.

Mach is developing the Quantum to replace Mach3 and this will completely change those acceleration values again.

The correct accel. values are the ones that feel right for you.

I guess it sounded like the gantry had jumped, or that the teeth of the pinion had jumped out of the rack - but if you look closely you will see that the teeth are not jumping. That noise comes out of the stepper motor when it jumps internal steps. Believe it or not, it is actually harmless - nothing is damaged. You just get a very loud warning that your stepper has lost a step or four. (Some people say you must use servo motors because you don't know if your stepper has lost a step - believe me, you do know when a stepper loses a step. It is loud!)

Regarding the spring tension, you had better check it against a scale. The tension must be about 12kg. link

fabrica Fri 19 January 2007 20:24

Gerald, I found the reason why the gantry is climbing on to the x rails. The pionion wheel is slipping against the motor shaft. I have fixed only one grub screw.

Now I am fitting another one more screw on all motor shafts.

Can you advice me on setting the limits on the Z axis.

Gerald_D Fri 19 January 2007 20:53

Those grubscrews must be very tight - sometimes I destroy the spanner/key/wrench when tightening them.

The z-axis limits are now described in this thread.

Gerald_D Fri 19 January 2007 21:16

Fabrica, once your router works, you need to go through quite a process of getting the axes square to each other. This is the time when you will be finally adjusting the x-axis limits and the shims behind the x-axis V-rollers. I will start another thread when you are ready for this. For now, get your router going so that you can cut the top of your table flat.

fabrica Fri 19 January 2007 23:54

Ok Thanks.

fabrica Sat 20 January 2007 05:23

Below given is a photo of the first cut I made with the Mechmate. The letters does not mean anything. Gerald, How is the quality of the cut. Do you think the machine is stable and free of unwanted vibrations.

http://www.mechmate.com/Forum/messages/329/3269.jpg

fabrica Sat 20 January 2007 05:31

Componets laid out before final wiring and getting mounted onto the box.

http://www.mechmate.com/Forum/messages/329/3271.jpg