![]() |
I have finally gotten to the point of grinding the angles on the rails. Took me much longer (and more trips to Lowes and Ace) than I was expecting to get the skate assembled.
Welding nuts for the height adjustment bolts worked great, but I was having trouble spacing the grinder to set the grinding wheel at a good location to engage as much of the bearings as possible without bottoming out on the angle iron's fillet. Finally got it right and zing! bevels a-plenty. Some things that were definitely helpful: 1. Clean off all the mill-scale. The bearings dont bind up then. 2. A little oil for the height bolt to slide on made movement smoother. 3. Clean up the 45 degree corners with a file so the v-wheel rolls smoothly. |
Well, I've made some progress on the table, but I right now I need to back off on the MM and concentrate on some other things. I am going to put my four OM PK296B2A-SG7.2 and four Gecko 203v's on ebay if no one here is interested.
|
whats the difference between the a2a and the b2a, Just the rear shaft?
|
Yes
|
Motors
Travis,
I sent you a pm w/regaurds to the steppers and geckos. |
| All times are GMT -6. The time now is 11:59. |
Powered by vBulletin® Version 3.8.3
Copyright ©2000 - 2026, Jelsoft Enterprises Ltd.