![]() |
#301
|
|||
|
|||
Cut our first batch of piecut dovetail drawers today. Jigging is complete and the programming is over with.
We use 100-125 of these drawers each month and the main reason for building the Mechmate. I haven't gotten total completed time down yet but I am guessing around 20 minutes for a completed product. We currently pay $30 each with a 4-5 week wait time. Materials is about 6 bucks so if we can hit that 20 minute timeframe George will make decent money. I am using a 14 deg dovetail bit on a 1" spread. It works out to calling it a .404 diameter bit at 7/16" deep cut. Lots of experimenting. THE BROWN IS MAKING GREEN Here is a video of our initial jigging. https://www.youtube.com/watch?v=h8XF...ature=youtu.be |
#302
|
|||
|
|||
Well done #127.
|
#303
|
|||
|
|||
Nice little production run !!
One nifty way to pay it off ! Congrads ![]() |
#304
|
|||
|
|||
I thought it was Copper Tone Bronze
![]() |
#305
|
|||
|
|||
Payback will be short. It is cutting all of our parts now. An added benefit has been the ability to declutter the shop of equipment. Time for a sale.
Alan, that was for Mr Saylers benefit. It is Coppertone bronze. |
#306
|
|||
|
|||
Pete - Great to see a MM get busy from the start !!! Keep posting the videos !!!
|
#307
|
|||
|
|||
I'll be expecting my first royalty check shortly.
|
#308
|
|||
|
|||
I will get it out in the email.
|
#309
|
|||
|
|||
Did a little video up today.
https://www.youtube.com/watch?v=MgBZ...ature=youtu.be |
#310
|
|||
|
|||
It would be a lot nicer video if you can hold your camera / phone horizontal so the recording is widescreen and fills the youtube screen. Also I find videos that show the machine from a fixed point more interesting as you can see the machine doing its thing (and judge its performance) instead of bouncing around
![]() |
#311
|
|||
|
|||
Agreed.
I should redo it correctly. Last edited by Kornerking; Tue 12 April 2016 at 16:13.. |
#312
|
|||
|
|||
What feeds and speeds, accel and velocity did you settle on? Its not much discussed subject here but its rather informative for others starting with Mechmate
|
#313
|
|||
|
|||
Velocity is at 125 ipm
Acceleration is at 30 I run my 3/16 cutter at the 125 ipm but the dovetailing bit at 80 ipm. Nice snappy corners. I should add my gantry is 1/4" steel on the tubes. The vacuum is holding the 5/8 material very well. Sometimes on the 1/4" it loses a little by the edges. Amazing that it will suck through the plywood. I may decide to add the 3rd motor up as well to use on the thinner stock. I built my spoilboard at 61x61 so the exposed 1inch may be leaking as well. I might be smart to seal that edge. |
#314
|
|||
|
|||
You lose a lot out of the edge and perimeter, Pete. Brush on a mix of 50/50 yellow glue/water. You'll be amazed.
|
#315
|
|||
|
|||
Thanks Darren.
The edges are all sealed that way. it is the perimeter. I had the vacuum on when I did the edges so it really sucked in. |
#316
|
|||
|
|||
Pete, got any pics of your logos done on your laser?
|
#317
|
|||
|
|||
Here you go Darren.
I do sets of 3. About 12 minutes. I use Vectric 2d laser program that came with the machine. |
#318
|
|||
|
|||
Here is the machine.
|
#319
|
|||
|
|||
Pete....in my quest to learn all this laser thing, I'm curious !?
Could you, when time permits, PM me the G-code to I may see & learn how I will be using mine ! Also, what machine your using that supplied this Vectric 2d laser program with your setup ? Thks |
#320
|
|||
|
|||
Robert, here is the link. https://darklylabs.com/
Yes the cut2d program came with it. I will get the g code for you. |
#321
|
|||
|
|||
"I will get the g code for you."
Great ![]() Maybe, if not to long or trouble, post it here....as you wish ! ![]() |
#322
|
|||
|
|||
Cool Pete.Thanks!!
|
#323
|
|||
|
|||
George has paid for himself!!
It's been just under 4 months and the MM has paid for itself.
It is kept busy about 3 days a week cutting sheet goods and doing dovetailing for drawers. I am also cutting out bodies for ukuleles. Pretty slick. |
#324
|
|||
|
|||
Well done.
We all love a success story. |
#325
|
|||
|
|||
Well done on fully utilising the machine, must feel really good doing that!
Just love the instruments, all of them ar pretty cool. I want to build my son one in preparation for a full sized guitar. I saw a cncrouterparts video on making a solid body ukulele so might use his stuff when I get around to it.. |
#326
|
|||
|
|||
From one Pete to another. Awesome job on your machine and work that you are doing!!!
|
#327
|
|||
|
|||
Thanks Pete. It has been a fun process.
|
#328
|
|||
|
|||
Nice Pete.
|
#329
|
|||
|
|||
Ukuleles on the Mechmate
Here is a little video of the completed ukes that I am crafting on my Mechmate.
Now I need to figure out how to do the necks. https://www.youtube.com/watch?v=qkP05Ql1Lx8 |
#330
|
|||
|
|||
They Sir are awesome! Heres a link to the cncrouterparts video that had files for download, maybe you can get an idea for the necks off that:
https://www.youtube.com/watch?v=-WCNph720XI |
![]() |
Register | Options | Profile | Last 1 | 3 | 7 Days | Search | Today's Posts | Mark Forums Read |
Thread Tools | |
|
|
![]() |
||||
Thread | Thread Starter | Forum | Replies | Last Post |
Back Doing Some Arcade Fun #19 - Smith's Falls, Ontario, Canada | bradyaero | MechMates already cutting | 146 | Tue 27 January 2015 09:41 |
'Clean' Vectors - free project plans for the woodworker | Kobus_Joubert | Golden Resources | 6 | Thu 13 August 2009 06:34 |
It's all Darren's fault!! - Big Falls, Mn | Construction started, but not cutting yet | 0 | Wed 31 December 1969 19:00 |