#31
|
|||
|
|||
Where's the progress report, Pete?
|
#32
|
|||
|
|||
Ya I know, still reading. Confused as heck, but still reading.
|
#33
|
|||
|
|||
It'll come to ya. And when it does, the light bulb will go on in your head.
|
#34
|
|||
|
|||
Just like Tom says.
Don't worry about understanding it 100% up front. I didn't, as evidenced by my build thread. The more you get behind you, the easier the rest becomes. |
#35
|
|||
|
|||
Looks like middle of January I should be able to get a good start on this. (hopefully). Heavy production going on right now and a home show coming up between Christmas and New years.
A key element in this will be the ability to create my chevron dovetail drawers. Based on this years usage I should save way more than the cost of the machine in less than a year. Then I need to install a lazer head on it for engraving. Has anyone done this? Trying to get the reading and research done up so I don't ask too many dumb questions. |
#36
|
|||
|
|||
The only dumb question is the one you don't ask. We all need help at times.
|
#37
|
|||
|
|||
#38
|
|||
|
|||
Once you get started, everything will fall in place. If it doesn't we will make sure they do
![]() |
#39
|
|||
|
|||
Thanks for the help.
This is why a laser is important to me. We logo all of our drawers and like the clarity of a laser. ![]() ![]() |
#40
|
|||
|
|||
Electric parts needed.
Trying to make sense of this.
If I order the kits from CVS : RB01, Basic control box, 4 motors and power supply, Is this what I need to wire it up or are there additional items such as the Geckos, etc? |
#41
|
|||
|
|||
Copied from Metalheads electric kits post:
If your looking for Electic Parts, review this thread and shoot me a PM. I have Motors, PS , Basic Electric Kits, Remotes, PMDX and Driver boards. The BC01,GB01,RB01 is $1249.12 delivered in the lower 48 states. MC01 - 4-640 oz Motors and 1 Matched power supply $595.00 delivered in the lower 48 states. You would still need to get the flexible wire from him to wire everything up. Last edited by darren salyer; Wed 11 December 2013 at 07:26.. |
#42
|
|||
|
|||
BTW, you're post on the other forum about buying a separate laser is spot on.
Trying to make the MM do too much makes it like a shopsmith.....does a lot of stuff but none of it as well as it could. |
#43
|
|||
|
|||
Thanks Darren. Sent a pm to Metalhead. Not all of it is listed on the CVS site so I was confused.
How is the end of January looking for you if I make a quick trip down? |
#44
|
|||
|
|||
Anytime, Pete.
I agree Mikes stuff can be a little confusing. Some CVSsupply website work would probably help sales....(Hint...) Give me a few days notice and we're on, but you shouldn't feel like the trip is necessary to achieving a working MM... |
#45
|
|||
|
|||
Had a nice visit with Pete this afternoon.
V-carved his logo into a piece of 1/2" BB plywood. Hopefully he'll be along to post some of the pics he took after he gets back home from vacation. |
#46
|
|||
|
|||
Vacation is over.
![]() Great visiting with you and your Bride, Darren. Haven't uploaded the pics yet. Showed them off while in Wichita. We ended cutting across and staying at the Lodge of the 4 seasons in Lake Ozark for a couple of days. Darren was the perfect teacher. I don't understand though how he keeps his woodshop so clean. Getting closer. |
#47
|
|||
|
|||
Hmmm, guy drives 12 hours to check out my MM, I MAY have straightened up a little and ran a broom around.
|
#48
|
|||
|
|||
Darren and Pete.
I am the young guy with the tape measure. He cut this out for me. Kool. |
#49
|
|||
|
|||
Make sure you move that picture to the MUGshot thread....that is great.
- yep, really clean shop! |
#50
|
|||
|
|||
The Korner King and the Basement King
![]() |
#51
|
|||
|
|||
I love it!!
|
#52
|
|||
|
|||
Whats the word, Pete?
|
#53
|
|||
|
|||
Well it's now 2 years later and looks like it's time to get back at this.
I bought the electronics and bent parts from Darren Sayler over a year ago and promptly got swamped. Then I started building ukuleles. Seeing more need for this machine. Primary payback will be doing the 45deg dovetail drawers. Our current supplier is backlogged 4-5 weeks and we just can't wait that long. Maybe this time. |
#54
|
|||
|
|||
Going back through this thread, the pix are missing. That is the best reason to actually upload the pix and not just reference them elsewhere. Oh well.
|
#55
|
|||
|
|||
I will try harder this time.
Sorry. |
#56
|
|||
|
|||
Not trying to pointing figures, but trying to kindly point it out. We all keep learning.
|
#57
|
|||
|
|||
I know that. Just my attempt at humor.
Does the concept of building the gantry and getting it working first still hold true? Sounds like a good way to go. |
#58
|
|||
|
|||
Welcome back.
I built the table first then used it as a workbench. Then again I did not have a workbench or a lot of room to work in. ![]() |
#59
|
|||
|
|||
Question?What is Mikes website for ordering kits?
|
#60
|
|||
|
|||
Www.cvsupply.com or just PM me and I will send you an invoice
|
![]() |
Register | Options | Profile | Last 1 | 3 | 7 Days | Search | Today's Posts | Mark Forums Read |
Thread Tools | |
|
|
![]() |
||||
Thread | Thread Starter | Forum | Replies | Last Post |
Back Doing Some Arcade Fun #19 - Smith's Falls, Ontario, Canada | bradyaero | MechMates already cutting | 146 | Tue 27 January 2015 09:41 |
'Clean' Vectors - free project plans for the woodworker | Kobus_Joubert | Golden Resources | 6 | Thu 13 August 2009 06:34 |
It's all Darren's fault!! - Big Falls, Mn | Construction started, but not cutting yet | 0 | Wed 31 December 1969 19:00 |