Hi,
After a ton of procrastination I have finally worked up th gumption to get my mechmate started (that and I had to really point out the benefits of building a 4 x 8 to my sister/boss). We own a small music shop that does repairs on instruments/amps, specializing in accordions. I built a small desktop cnc machine a while back, thinking it would satiate the bug, boy was I ever wrong. Anyways, I am about to get started on my build, so be ready for the questions. I tend to think that I am better then I am, and don't start asking for help til I have painted myself into a corner, so please be gently. |
#2
|
|||
|
|||
Hopefully any corner you manage to paint yourself into will have a computer in it so you can get to the forum, there's all kinds of great information here and if you can't find the answer somebody will probably come up with one quickly.
Welcome, keep us up to date with your mayhem. |
#3
|
|||
|
|||
John,
Print off the plans and do lots of reading. Good luck with your build. |
#4
|
|||
|
|||
Ordered the laser part kits from Castone today. Looks like I am about to jump in head first. I have been kicking around ideas for the base table. I really like the table that Greg (bradyaero) made. I am kicking around away to make the height adjustment easier. Was kinda thinking of making some plates like bed frames used have (see attached), using 1/2 inch bolts instead of plain guide pins. That way I can loosen the bolts, grab a friend and adjust the height of the bed pretty quickly, then tighten the bolts again. There would be 3 of the brackets on each side. What do you guys think?
|
#5
|
|||
|
|||
Have you considered just placing the table as low as you would ever want it, and then making a set of wooden boxes to space up to your upper working height?
Moving four boxes on or off the table could be a one man job, unless you store too much stuff (hint, hint) inside them. |
#6
|
|||
|
|||
That and storing them when they are not on the table I have to find a place to store em.
|
#7
|
|||
|
|||
I purchased all the metal for the table today, and it arrives tomorrow. My laser cut parts are due to arrive on Monday, so it looks like I am finally on my way to a mechmate!
|
#8
|
|||
|
|||
I see your parts have made it to AZ ,Time to start building that table.Looks like you will have them Monday.
|
#9
|
|||
|
|||
I have been getting things organized for the build. Bought a bandsaw on Saturday. Working on making Aluminum templates for the drilling of the cross bearers and tabletop. And the dreaded cleaning of the work room
Considering this stepper for the build http://www.kelinginc.net/KL34H295-43-8B.pdf. I can get them even cheaper then the motionking motors, and they seem comparable. Already have the Gecko 203v drives and PMDX BoB. So that just leaves the power supply and other misc electrical stuff. Last edited by zigmart; Sun 23 August 2009 at 22:24.. |
#10
|
|||
|
|||
what's the laser parts kit going for these days at Castone??
|
#11
|
|||
|
|||
Finished 2.5 years ago. Just to busy to get a serial >.<
I actually finished my build 2.5 years ago, and just neglected to get a serial due to being busy doing other things.
2.2 kw water-cooled spindle, Hitachi VFD controlled by Mach3 via Modbus. Custom Z axis with Hiwin Linear Rails Belt Drive reduction V bearing rails from Superior mounted to aluminum 4x8 cutting area As you can see by the pictures I didn't go with the standard base structure. This is a totally bolt together table |
#12
|
|||
|
|||
Well done John.
It looks like a good workhorse. I think I have 2 1/2 years to go before mine is finished. |
#13
|
|||
|
|||
Wow !! Pop goes the MechMates !!! I think you get 112 !!!
|
#14
|
|||
|
|||
John,
Congratulations on getting your serial number 112! I was wondering when I would see the 100 machine built and given a serial number since I finished my machine. Though you have been using your machine for some time. I wish you much success with you machine. Congratulations from #12. Warm regards Nils |
#15
|
|||
|
|||
Updated Builder's Log
John,
Allow me to add my congratulations on earning Serial #112. Here is the Updated Builder's Log with your entry. Thanks for providing the summary of your build. I tried to include the important features in the comment field. Take a look at your entry and let me know if you would like any changes. I try to keep the entries to one line, so the comments field is somewhat limited. |
#16
|
|||
|
|||
Great to see another "oldie" still around
Congards on your set up.....and serial ! I guest I'm one of the few (and maybe the only remaining)....real oldies....w/out a serial ! What's the fuss.....what's the rush Enjoy great time & business with it Robert |
#17
|
|||
|
|||
Robert,
you are not alone. Me TWO. |
#18
|
|||
|
|||
Congratulations 112
|
|
|
Similar Threads | ||||
Thread | Thread Starter | Forum | Replies | Last Post |
Weighing in from Phoenix AZ, starting build ASAP! | Ensign | Introduce yourself and start planning | 3 | Mon 16 September 2013 22:34 |
Well it is rather warm in Phoenix AZ right so I,ve been reading the forum. | catsmeow | Introduce yourself and start planning | 3 | Wed 31 August 2011 22:11 |
New to forums, Phoenix Arizona | curtis1dean | Introduce yourself and start planning | 4 | Thu 18 February 2010 10:20 |