MechMate CNC Router Forum

Go Back   MechMate CNC Router Forum > Search Forums
Register Options Profile Last 1 | 3 | 7 Days Today's Posts

Showing results 1 to 3 of 3
Search took 0.00 seconds.
Search: Posts Made By: bradm
Forum: 70. Control Systems Tue 13 August 2013, 20:24
Replies: 21
Views: 31,559
Posted By bradm
Yes, the BID is the indicator lamp. Time to...

Yes, the BID is the indicator lamp. Time to stare at those wiring diagrams until it starts to make sense.

The basic idea is that the contactor holds itself in via a circuit that comes from one...
Forum: 70. Control Systems Tue 13 August 2013, 14:30
Replies: 21
Views: 31,559
Posted By bradm
The red/white/green should actually be two...

The red/white/green should actually be two switches (and optionally a status lamp behind the while). The Green should be a normally open switch, and the Red should be a normally closed switch. You...
Forum: 70. Control Systems Sat 10 August 2013, 06:13
Replies: 21
Views: 31,559
Posted By bradm
Sounds like you have twin primary windings. This...

Sounds like you have twin primary windings. This is common so that you can wire them in parallel for 115V input and in series for 230V input and get the same output. You probably want the two black...
Showing results 1 to 3 of 3

 
Forum Jump

All times are GMT -6. The time now is 11:58.


Powered by vBulletin® Version 3.8.3
Copyright ©2000 - 2024, Jelsoft Enterprises Ltd.