Forum: Construction started, but not cutting yet Sat 30 January 2010, 05:51
Replies: 121
Views: 161,426
Posted By Atifeh
Gerald, thanks for all your helpful notes. ...

Gerald, thanks for all your helpful notes.

Actually I made the parallel port connections from Alan's thread. The metal part on the DB25 does not touch the control panel. So even if the parallel...
Forum: Construction started, but not cutting yet Fri 29 January 2010, 14:01
Replies: 121
Views: 161,426
Posted By Atifeh
Something strange:

During setting up the Mach, I had the VFD switched off. As you have noticed, an automatic fuse is installed inside the panel which isolates the VFD, monitored by the “VFD Online” signal lamp. This...
Forum: Construction started, but not cutting yet Fri 29 January 2010, 13:56
Replies: 121
Views: 161,426
Posted By Atifeh
Setting up the Mach

I do not have the Mach3, but I have an old version of Mach2 which served me fine through years. I suspect I could activate the Z setting function with Mach2.

Posting the xml files will do no good...
Forum: Construction started, but not cutting yet Fri 29 January 2010, 13:50
Replies: 121
Views: 161,426
Posted By Atifeh
Some notes about attaching parallel port boards:

Installation is quite easy. You open up the case, put it in place, start the computer and install the provided software. Mine is a Wipro (around $11) which works fine. You then open the device...
Forum: Construction started, but not cutting yet Fri 29 January 2010, 13:46
Replies: 121
Views: 161,426
Posted By Atifeh
A note worth reminding:

In one of his posts, Gerald suggested to isolate the motor’s shaft end opening, to be sealed with some adhesive tape.

8340

Some other modifications were done prior to starting. I replaced the...
Forum: Construction started, but not cutting yet Tue 26 January 2010, 13:29
Replies: 121
Views: 161,426
Posted By Atifeh
Hello all, Sorry for the delay. The machine...

Hello all,

Sorry for the delay. The machine is running but I have been through some adjustments, fine tunings, last minute works and also a lot of work on Artcam, DeskProto and PowerMill,...
Forum: Construction started, but not cutting yet Thu 07 January 2010, 15:47
Replies: 121
Views: 161,426
Posted By Atifeh
I made a few clamps. Some from the tailings of...

I made a few clamps. Some from the tailings of the rails and some from 50x50x5 angle iron. Pieces cut, deburred, phosphatized and drilled a 8.5mm hole in the middle and 2 or 3 holes drilled and...
Forum: Construction started, but not cutting yet Wed 06 January 2010, 14:01
Replies: 121
Views: 161,426
Posted By Atifeh
Thanks Robert and Joe. Thanks Normand for...

Thanks Robert and Joe.
Thanks Normand for reminding me of the problem. I have to find a solution for it.
Forum: Construction started, but not cutting yet Tue 05 January 2010, 12:30
Replies: 121
Views: 161,426
Posted By Atifeh
Making the table

First of all, I wish you all a very happy and prosperous year ahead.
There has been some mixed activities within the last weeks which I will organize and post.

The main (under) board is placed on...
Forum: Construction started, but not cutting yet Wed 23 December 2009, 13:37
Replies: 121
Views: 161,426
Posted By Atifeh
The motor cables through the connectors. They are...

The motor cables through the connectors. They are tagged on the cable and on the panel for ease of tracing.
7877

Motor cables inside the flexible cable hoses bundled and passed through the...
Forum: Construction started, but not cutting yet Mon 21 December 2009, 16:09
Replies: 121
Views: 161,426
Posted By Atifeh
Finishing the button box

The 12VAC circuit of the Estop is shown in the upper picture, connected in series, cableshoe attached to end in two of the NC terminals of the Estop.
It might be worth noting that the gray cable is...
Forum: Construction started, but not cutting yet Sun 20 December 2009, 11:53
Replies: 121
Views: 161,426
Posted By Atifeh
Joe, Glad they are helpful. If you need any...

Joe,
Glad they are helpful. If you need any details for the photos I can post it in here.
Forum: Construction started, but not cutting yet Sat 19 December 2009, 13:05
Replies: 121
Views: 161,426
Posted By Atifeh
Mounting the Z axis motor. I changed the spring...

Mounting the Z axis motor. I changed the spring to 2.5 mm wire. The 2.2 and 2 mm wire went into plastic deformation and the spring did not return to its original length.
7788

Correcting the...
Forum: Construction started, but not cutting yet Fri 18 December 2009, 12:49
Replies: 121
Views: 161,426
Posted By Atifeh
Gerald, thanks for your keen eyes. It is apparent...

Gerald, thanks for your keen eyes. It is apparent that I have forgotten it. It will be fixed by tomorrow.
Forum: Construction started, but not cutting yet Thu 17 December 2009, 14:54
Replies: 121
Views: 161,426
Posted By Atifeh
Wiring the machine

I devised a sequence for cabling the machine. I made a lot of mistakes on the other machine and this procedure is the result of that experience. It is only a methodology which you can devise and...
Forum: Construction started, but not cutting yet Thu 17 December 2009, 14:45
Replies: 121
Views: 161,426
Posted By Atifeh
Robert, Claus, Thanks. These works are inspired...

Robert, Claus,
Thanks. These works are inspired by your and others works in this forum.
Forum: Construction started, but not cutting yet Wed 16 December 2009, 13:29
Replies: 121
Views: 161,426
Posted By Atifeh
Finishing the control panel

This is a single connector that incorporates: Estop signal, Home (X1,Y,Z), Home X2, Home B, Pause, Resume, Zset and a common GND.
7751

All the wires that will lead to the breakout boards:
7752 ...
Forum: Construction started, but not cutting yet Wed 16 December 2009, 13:12
Replies: 121
Views: 161,426
Posted By Atifeh
Alan, Ken, Thanks for your comments. You are...

Alan, Ken,

Thanks for your comments. You are both right. To tell you the truth, my first layout was that the drivers were arranged vertically, drawing air from above, but in order to have...
Forum: Construction started, but not cutting yet Tue 15 December 2009, 13:51
Replies: 121
Views: 161,426
Posted By Atifeh
Here are a set of carbide bits, newly bought....

Here are a set of carbide bits, newly bought. Although I was told that they are usually used by stone cutters but they work outstanding on MDF. On the other machine, a 6mm diameter tool cuts 6 mm...
Forum: Construction started, but not cutting yet Tue 15 December 2009, 13:44
Replies: 121
Views: 161,426
Posted By Atifeh
Connecting the drivers

Connector side of motors wiring:
7725

Driver side with separate grounds for motors wiring:
7726

Arrangement of the motor/driver wires:
7727

Preparation of wires between the driver and...
Forum: Construction started, but not cutting yet Mon 07 December 2009, 12:29
Replies: 121
Views: 161,426
Posted By Atifeh
Wiring of the control panel

Here will be the stages of wiring the control panel as I progress.

Prior to starting, the box was vacuum cleaned and cleaned with a damp cloth. No traces of drilling chips.
Placing and securing...
Forum: Construction started, but not cutting yet Mon 07 December 2009, 12:19
Replies: 121
Views: 161,426
Posted By Atifeh
Wiring diagram update

The following changes have been reflected in the new diagram:
Some errative colour coded wires are corrected.
The preliminary wiring of the VFD and the 0-10V board are added.
Another Estop switch...
Forum: Construction started, but not cutting yet Sat 05 December 2009, 15:33
Replies: 121
Views: 161,426
Posted By Atifeh
Starting the electrical

The cables I use. From top to bottom:
Common ground signals cable (except for the motors), i.e. Estop signal (pin10), Pause, Resume, Zset, Home X1,X2,Y,Z,B and GND.
Spindle cable.
Motors cables....
Forum: Construction started, but not cutting yet Sat 05 December 2009, 15:18
Replies: 121
Views: 161,426
Posted By Atifeh
Details of X axis echain: after the echain a...

Details of X axis echain: after the echain a sheet metal duct is installed. A perforated plate has been devised to carry one end of the flexible cable hose.
7494

Spindle and its mounting plate...
Forum: Construction started, but not cutting yet Sat 05 December 2009, 15:15
Replies: 121
Views: 161,426
Posted By Atifeh
I personally agree with Gerald. If I were in his...

I personally agree with Gerald. If I were in his place my answer would be the same. It is not fair to introduce various designs and ask him to comment. Gerald was very considerate to note a fault in...