MechMate CNC Router Forum

MechMate CNC Router Forum (http://www.mechmate.com/forums/index.php)
-   MechMates already cutting (http://www.mechmate.com/forums/forumdisplay.php?f=78)
-   -   Got clean air now!! #127 - Big Falls, Mn (http://www.mechmate.com/forums/showthread.php?t=4277)

darren salyer Fri 06 December 2013 18:27

Where's the progress report, Pete?

Kornerking Fri 06 December 2013 21:09

Ya I know, still reading. Confused as heck, but still reading.

Tom Ayres Fri 06 December 2013 21:17

It'll come to ya. And when it does, the light bulb will go on in your head.

darren salyer Sat 07 December 2013 06:21

Just like Tom says.
Don't worry about understanding it 100% up front.
I didn't, as evidenced by my build thread.
The more you get behind you, the easier the rest becomes.

Kornerking Sat 07 December 2013 06:33

Looks like middle of January I should be able to get a good start on this. (hopefully). Heavy production going on right now and a home show coming up between Christmas and New years.

A key element in this will be the ability to create my chevron dovetail drawers. Based on this years usage I should save way more than the cost of the machine in less than a year. Then I need to install a lazer head on it for engraving. Has anyone done this?

Trying to get the reading and research done up so I don't ask too many dumb questions.

pblackburn Sat 07 December 2013 06:45

The only dumb question is the one you don't ask. We all need help at times.

pblackburn Sat 07 December 2013 06:55

Here is some information

http://www.mechmate.com/forums/showt...aser+engraving

KenC Sat 07 December 2013 09:18

Once you get started, everything will fall in place. If it doesn't we will make sure they do :)

Kornerking Sat 07 December 2013 11:20

Thanks for the help.

This is why a laser is important to me. We logo all of our drawers and like the clarity of a laser.
https://lh4.googleusercontent.com/-p...112534_043.jpg

https://lh4.googleusercontent.com/-g...112429_766.jpg

Kornerking Wed 11 December 2013 07:19

Electric parts needed.
 
Trying to make sense of this.

If I order the kits from CVS : RB01, Basic control box, 4 motors and power supply, Is this what I need to wire it up or are there additional items such as the Geckos, etc?

darren salyer Wed 11 December 2013 07:23

Copied from Metalheads electric kits post:

If your looking for Electic Parts, review this thread and shoot me a PM. I have Motors, PS , Basic Electric Kits, Remotes, PMDX and Driver boards.

The BC01,GB01,RB01 is $1249.12 delivered in the lower 48 states.

MC01 - 4-640 oz Motors and 1 Matched power supply $595.00 delivered in the lower 48 states
.


You would still need to get the flexible wire from him to wire everything up.

darren salyer Wed 11 December 2013 07:26

BTW, you're post on the other forum about buying a separate laser is spot on.
Trying to make the MM do too much makes it like a shopsmith.....does a lot of stuff but none of it as well as it could.

Kornerking Wed 11 December 2013 07:41

Thanks Darren. Sent a pm to Metalhead. Not all of it is listed on the CVS site so I was confused.

How is the end of January looking for you if I make a quick trip down?

darren salyer Wed 11 December 2013 07:47

Anytime, Pete.
I agree Mikes stuff can be a little confusing. Some CVSsupply website work would probably help sales....(Hint...)
Give me a few days notice and we're on, but you shouldn't feel like the trip is necessary to achieving a working MM...

darren salyer Sun 09 February 2014 15:09

Had a nice visit with Pete this afternoon.
V-carved his logo into a piece of 1/2" BB plywood.
Hopefully he'll be along to post some of the pics he took after he gets back home from vacation.

Kornerking Wed 19 February 2014 11:02

Vacation is over. :mad:

Great visiting with you and your Bride, Darren. Haven't uploaded the pics yet. Showed them off while in Wichita. We ended cutting across and staying at the Lodge of the 4 seasons in Lake Ozark for a couple of days.

Darren was the perfect teacher. I don't understand though how he keeps his woodshop so clean.

Getting closer.

darren salyer Wed 19 February 2014 14:55

Hmmm, guy drives 12 hours to check out my MM, I MAY have straightened up a little and ran a broom around.

Kornerking Thu 20 February 2014 13:08

Darren and Pete.

I am the young guy with the tape measure.

He cut this out for me. Kool.

https://lh3.googleusercontent.com/-u...-no/Darren.JPG

smreish Thu 20 February 2014 13:56

Make sure you move that picture to the MUGshot thread....that is great.
- yep, really clean shop!

Alan_c Thu 20 February 2014 14:02

The Korner King and the Basement King :D

darren salyer Thu 20 February 2014 17:01

I love it!!

darren salyer Thu 27 March 2014 05:29

Whats the word, Pete?

Kornerking Mon 30 November 2015 16:09

Well it's now 2 years later and looks like it's time to get back at this.
I bought the electronics and bent parts from Darren Sayler over a year ago and promptly got swamped. Then I started building ukuleles. Seeing more need for this machine.

Primary payback will be doing the 45deg dovetail drawers. Our current supplier is backlogged 4-5 weeks and we just can't wait that long.
Maybe this time.

servant74 Mon 30 November 2015 17:40

Quote:
Originally Posted by Kornerking View Post
Thanks for the help.

This is why a laser is important to me. We logo all of our drawers and like the clarity of a laser.
https://lh4.googleusercontent.com/-p...112534_043.jpg

https://lh4.googleusercontent.com/-g...112429_766.jpg
Going back through this thread, the pix are missing. That is the best reason to actually upload the pix and not just reference them elsewhere. Oh well.

Kornerking Mon 30 November 2015 18:01

I will try harder this time.
Sorry.

servant74 Mon 30 November 2015 18:31

Not trying to pointing figures, but trying to kindly point it out. We all keep learning.

Kornerking Tue 01 December 2015 05:15

I know that. Just my attempt at humor.

Does the concept of building the gantry and getting it working first still hold true? Sounds like a good way to go.

lonestaral Tue 01 December 2015 18:19

Welcome back.
I built the table first then used it as a workbench.
Then again I did not have a workbench or a lot of room to work in.:D

Kornerking Wed 02 December 2015 05:44

Question?What is Mikes website for ordering kits?

MetalHead Wed 02 December 2015 10:15

Www.cvsupply.com or just PM me and I will send you an invoice


All times are GMT -6. The time now is 05:38.

Powered by vBulletin® Version 3.8.3
Copyright ©2000 - 2024, Jelsoft Enterprises Ltd.